Community: DOUBLE L MOBILE RANCH PARK
County: Fresno
Sys. Category: Complete water system only
Agency Name: DOUBLE L MOBILE RANCH PARK
Ownership: Private
Ownership Type: Private non-PUC reg
Population: 80
Connections: 1
2010 MHI: 29,333
SDAC or DAC: SDAC
DAC Classification Source: Calculated
IRWMP: UKBIRWMA
Geography: Valley Floor
Location: Fresno
Contact Title:
Contact: GERALD TODD
Phone:
Alt. Contact:
Phone:
H2O Sys. Num.: 1000248
Water Source: GW
Active Wells Count: 2
Wells Issues?: XXXXX
Issues: Uranium over MCL; August 2011 compliance order - This public water system is a community system that serves approximately 80 individuals through 37 service connections. The water system is believed to be a disadvantaged community located in rural Fresno C
Potential Solutions:
Water quality sample results for selected constituents. Values shown for water samples collected 2004-2014. | |||||||||||||
Raw Water | Delivered Water | Raw Water | Delivered Water | ||||||||||
Max. | Ave. | Count | Max. | Ave. | Count | Max. | Ave. | Count | Max. | Ave. | Count | ||
Arsenic (10 ug/L): | 2.50 | 2.33 | 3 | 2.50 | 2.33 | 3 | Flouride (2 mg/L): | 0.10 | 0.07 | 3 | 0.10 | 0.07 | 3 |
DBCP (0.2 ug/L): | 0.50 | 0.13 | 4 | 0.50 | 0.13 | 4 | Perchlorate (6 ug/L): | 4.00 | 4.00 | 3 | 4.00 | 4.00 | 3 |
Nitrate as NO3 (45 mg/L): | 26.00 | 17.80 | 7 | 26.00 | 17.80 | 7 | TCE (5 ug/L): | 0.50 | 0.50 | 1 | 0.50 | 0.50 | 1 |
PCB (0.5ug/L): | 8 | 8 | THMs (80 ug/L): | 0.50 | 0.50 | 8 | 0.50 | 0.50 | 8 | ||||
Uranium (20 pC/L): | 32.00 | 20.26 | 8 | 32.00 | 20.26 | 8 |
WW Sys. Num.:
Treatment: XXXXX
Design Flow (MGD):
Total Enforcement Actns:
Cat.1 Viol:
Cat. 2 Viol:
Septic Probs?: XXXXX
Sewer Issues:
Potential Solutions: 3 miles from Kerman - The anticipated project includes the evaluation of alternatives and development of plans and specifications for the selected alternative. Currently, a new source, treatment, or a combination of the two, are being considered. The City of Kerman is approximately 3 miles away; consolidation is not expected to be economically feasible. The Water System imagines any project would provide additionally reliability in the case of source of supply failure, through either a secondary source (through the replacement of current primary source) or added source capacity. - Drill a new well or interconnection if possible.
Treatment Comm: XXXXX
SelfHelp Comments: Plus approx 34 houses in neighborhood; 11470 W. Church, Fresno