Community: MALAGA COUNTY WATER DISTRICT
County: Fresno
Sys. Category: Complete water and wastewater systems
Agency Name: MALAGA COUNTY WATER DISTRICT
Ownership: Public (state, federal, local)
Ownership Type: City, County, State owned
Population: 1200
Connections: 465
2010 MHI: 33,092
SDAC or DAC: SDAC
DAC Classification Source: Calculated
IRWMP: UKBIRWMA
Geography: Valley Floor
Location:
Contact Title:
Contact:
Phone:
Alt. Contact:
Phone:
H2O Sys. Num.: 1010042
Water Source: GW
Active Wells Count: 9
Wells Issues?: XXXXX
Issues: Water quality from Well No. 5 exceeds the maximum contaminant level for DBCP as defined in Section 64445.1 (c)(5)(B) of Title 22, California Code of Regulations. The MCL is 0.2 microgm/l (ppb) and the well produces water in concentrations of 0.62 microgm
Potential Solutions:
Water quality sample results for selected constituents. Values shown for water samples collected 2004-2014. | |||||||||||||
Raw Water | Delivered Water | Raw Water | Delivered Water | ||||||||||
Max. | Ave. | Count | Max. | Ave. | Count | Max. | Ave. | Count | Max. | Ave. | Count | ||
Arsenic (10 ug/L): | 3.90 | 2.57 | 7 | 3.90 | 2.57 | 7 | Flouride (2 mg/L): | 0.17 | 0.15 | 7 | 0.17 | 0.15 | 7 |
DBCP (0.2 ug/L): | 0.60 | 0.21 | 11 | 0.60 | 0.21 | 11 | Perchlorate (6 ug/L): | 4.00 | 1.33 | 9 | 4.00 | 1.33 | 9 |
Nitrate as NO3 (45 mg/L): | 48.00 | 15.82 | 126 | 48.00 | 15.82 | 126 | TCE (5 ug/L): | 0.50 | 0.22 | 9 | 0.50 | 0.22 | 9 |
PCB (0.5ug/L): | 0.00 | 0.00 | 2 | 0.00 | 0.00 | 2 | THMs (80 ug/L): | 1.00 | 0.50 | 2 | 1.00 | 0.50 | 2 |
Uranium (20 pC/L): | 3.08 | 1.54 | 2 | 3.08 | 1.54 | 2 |
WW Sys. Num.: 273179
Treatment: XXXXX
Design Flow (MGD): 1.65
Total Enforcement Actns: 2
Cat.1 Viol: 1
Cat. 2 Viol: 0
Septic Probs?: XXXXX
Sewer Issues:
Potential Solutions: The project consists of design and construction of a new well to avoid contaminants and connection to the water distribution system. - The project consists of acquiring a new well site, drilling a test well, design and construction of a new well, connection to the water distribution system, and abandonment of Well No. 5. - The project consists of acquiring a new well site, drilling a test well, design and construction of new well, connection to the water distribution system, and abandonment of Well No. 3. - INSTALL NEW 750,000 GALLON WATER STORAGE TANK. OTHER - DESIGN AND CONSTRUCTION - LOOP THE SYSTEM. OTHER - DESIGN AND CONSTRUCT - INSTALL SCADA SYSTEM. OTHER - DESIGN AND CONSTRUCTION
Treatment Comm: XXXXX
SelfHelp Comments: