Water System Details

Community: MALAGA COUNTY WATER DISTRICT
County: Fresno
Sys. Category: Complete water and wastewater systems
Agency Name: MALAGA COUNTY WATER DISTRICT
Ownership: Public (state, federal, local)
Ownership Type: City, County, State owned
Population: 1200
Connections: 465
2010 MHI: 33,092
SDAC or DAC: SDAC
DAC Classification Source: Calculated

IRWMP: UKBIRWMA
Geography: Valley Floor
Location:

Contact Title:
Contact:
Phone:
Alt. Contact:
Phone:

H2O Sys. Num.: 1010042
Water Source: GW
Active Wells Count: 9
Wells Issues?: XXXXX
Issues: Water quality from Well No. 5 exceeds the maximum contaminant level for DBCP as defined in Section 64445.1 (c)(5)(B) of Title 22, California Code of Regulations. The MCL is 0.2 microgm/l (ppb) and the well produces water in concentrations of 0.62 microgm

Potential Solutions:

  Water quality sample results for selected constituents. Values shown for water samples collected 2004-2014.
  Raw Water Delivered Water   Raw Water Delivered Water
  Max. Ave. Count Max. Ave. Count   Max. Ave. Count Max. Ave. Count
Arsenic (10 ug/L): 3.90 2.57 7 3.90 2.57 7 Flouride (2 mg/L): 0.17 0.15 7 0.17 0.15 7
DBCP (0.2 ug/L): 0.60 0.21 11 0.60 0.21 11 Perchlorate (6 ug/L): 4.00 1.33 9 4.00 1.33 9
Nitrate as NO3 (45 mg/L): 48.00 15.82 126 48.00 15.82 126 TCE (5 ug/L): 0.50 0.22 9 0.50 0.22 9
PCB (0.5ug/L): 0.00 0.00 2 0.00 0.00 2 THMs (80 ug/L): 1.00 0.50 2 1.00 0.50 2
Uranium (20 pC/L): 3.08 1.54 2 3.08 1.54 2              

WW Sys. Num.: 273179
Treatment: XXXXX
Design Flow (MGD): 1.65

Total Enforcement Actns: 2
Cat.1 Viol: 1
Cat. 2 Viol: 0

Total Viol: 185

Septic Probs?: XXXXX
Sewer Issues:
Potential Solutions: The project consists of design and construction of a new well to avoid contaminants and connection to the water distribution system. - The project consists of acquiring a new well site, drilling a test well, design and construction of a new well, connection to the water distribution system, and abandonment of Well No. 5. - The project consists of acquiring a new well site, drilling a test well, design and construction of new well, connection to the water distribution system, and abandonment of Well No. 3. - INSTALL NEW 750,000 GALLON WATER STORAGE TANK. OTHER - DESIGN AND CONSTRUCTION - LOOP THE SYSTEM. OTHER - DESIGN AND CONSTRUCT - INSTALL SCADA SYSTEM. OTHER - DESIGN AND CONSTRUCTION
Treatment Comm: XXXXX
SelfHelp Comments: