Community: PINON HILL WATER COMPANY
County: Kern
Sys. Category: Complete water system only
Agency Name: PINON HILL WATER COMPANY
Ownership: Public (state, federal, local)
Ownership Type: Private non-PUC reg
Population: 80
Connections: 37
2010 MHI: 61,726
SDAC or DAC: Non-DAC
DAC Classification Source: Calculated
IRWMP: KERN
Geography: Mountains
Location: Tehachapi
Contact Title: OWNER
Contact: LAWANDA STANLEY
Phone:
Alt. Contact:
Phone:
H2O Sys. Num.: 1500540
Water Source: GW
Active Wells Count: 1
Wells Issues?: XXXXX
Issues: High arsenic in source water, exceeds MCL.-PINON HILL WATER CO. System No. 1500540 has been issued a Compliance Order for Violation of Arsenic MCL for Arsenic. The Compliance Order No. is 03-19-090-06 for Violation of the California State Drinking Water A
Potential Solutions:
Water quality sample results for selected constituents. Values shown for water samples collected 2004-2014. | |||||||||||||
Raw Water | Delivered Water | Raw Water | Delivered Water | ||||||||||
Max. | Ave. | Count | Max. | Ave. | Count | Max. | Ave. | Count | Max. | Ave. | Count | ||
Arsenic (10 ug/L): | 17.00 | 12.99 | 24 | 17.00 | 12.99 | 24 | Flouride (2 mg/L): | 0.67 | 0.51 | 2 | 0.67 | 0.51 | 2 |
DBCP (0.2 ug/L): | 1.00 | 1.00 | 1 | 1.00 | 1.00 | 1 | Perchlorate (6 ug/L): | 4.00 | 4.00 | 2 | 4.00 | 4.00 | 2 |
Nitrate as NO3 (45 mg/L): | 7.90 | 4.24 | 7 | 7.90 | 4.24 | 7 | TCE (5 ug/L): | 0.50 | 0.50 | 1 | 0.50 | 0.50 | 1 |
PCB (0.5ug/L): | 7 | 7 | THMs (80 ug/L): | 2.00 | 2.00 | 7 | 2.00 | 2.00 | 7 | ||||
Uranium (20 pC/L): | 6.90 | 5.63 | 7 | 6.90 | 5.63 | 7 |
WW Sys. Num.:
Treatment: XXXXX
Design Flow (MGD):
Total Enforcement Actns:
Cat.1 Viol:
Cat. 2 Viol:
Septic Probs?: XXXXX
Sewer Issues:
Potential Solutions: Install treatment or consolidate with neighboring utility, if possible.-The Company is in negotiation with two separate concerns to obtain the best removal system at a fair price. Their engineers are at work on the plans for a 50gpm removal system which will be placed in the existing new well house. A preliminary estimate of the costs will not exceed $35,000 and work can begin in 30 days.This project should be in Category G. Applicant is regulated by the California Public Utilities Commission.-Drill new well or consolidate with neighboring water system, if possible-Drill new well, add storage and replace undersized pipe with 4" diameter mains.-Replace reservoir.-DRILL NEW WELL. OTHER - DESIGN AND CONSTRUCTION
Treatment Comm: XXXXX
SelfHelp Comments: