Water System Details

Community: LONG CANYON WATER COMPANY CORP.
County: Kern
Sys. Category: Complete water system only
Agency Name: LONG CANYON WATER COMPANY CORP.
Ownership: Private
Ownership Type: Private PUC Reg
Population: 170
Connections: 67
2010 MHI: 30,951
SDAC or DAC: SDAC
DAC Classification Source: Calculated

IRWMP: KERN
Geography: Mountains
Location: Weldon

Contact Title: OWNER
Contact: DAVE PRINCE
Phone:
Alt. Contact:
Phone:

H2O Sys. Num.: 1500578
Water Source: GW
Active Wells Count: 2
Wells Issues?: XXXXX
Issues: This project would inter-connect small water systems that have existing sources of supply in violation of arsenic, nitrate, uranium and secondary MCL's. The project would also interconnect small community water systems that have only one existing source

Potential Solutions:

  Water quality sample results for selected constituents. Values shown for water samples collected 2004-2014.
  Raw Water Delivered Water   Raw Water Delivered Water
  Max. Ave. Count Max. Ave. Count   Max. Ave. Count Max. Ave. Count
Arsenic (10 ug/L): 2.00 2.00 4 2.00 2.00 4 Flouride (2 mg/L): 0.71 0.64 4 0.71 0.64 4
DBCP (0.2 ug/L): 1.00 0.21 5 1.00 0.21 5 Perchlorate (6 ug/L): 4.00 4.00 2 4.00 4.00 2
Nitrate as NO3 (45 mg/L): 17.00 3.89 10 17.00 3.89 10 TCE (5 ug/L): 0.50 0.50 3 0.50 0.50 3
PCB (0.5ug/L): 6 6 THMs (80 ug/L): 8.00 4.00 6 8.00 4.00 6
Uranium (20 pC/L): 23.90 15.98 6 23.90 15.98 6              

WW Sys. Num.:
Treatment: XXXXX
Design Flow (MGD):

Total Enforcement Actns:
Cat.1 Viol:
Cat. 2 Viol:

Total Viol:

Septic Probs?: XXXXX
Sewer Issues:
Potential Solutions: The study would evaluate the best location and size of the pipeline that would inter-connect these systems and also the needed storage tanks and booster pumps that would be needed to supply the entire interconnected small systems. The study would evaluate the needed source capacity for the entire system and the need for additional new source(s) to serve the completed project.-The construction project would include new sources (if needed) to meet demand of the entire completed system, 11-mile long pipeline that would inter-connect these systems and also the needed storage tanks and booster pumps to supply the entire interconnected small systems.-DRILL NEW WELL. OTHER - DESIGN AND CONSTRUCTION
Treatment Comm: XXXXX
SelfHelp Comments: