Water System Details

Error there is more than one entry for Water System Areas.
(Geography, IRWMP, System Category, MHI2010, and DAC calculation are incorrect in database.)

Community: EAST NILES CSD
County: Kern
Sys. Category:
Agency Name: CSD of EAST NILES
Ownership: Public (state, federal, local)
Ownership Type: City, County, State owned
Population: 26000
Connections: 7835
2010 MHI: 0,000
SDAC or DAC: SDAC
DAC Classification Source: Calculated

IRWMP:
Geography:
Location: East Bakersfield

Contact Title: General Manager
Contact: Tim Ruiz
Phone:
Alt. Contact:
Phone:

H2O Sys. Num.: 1510006
Water Source: S&GW
Active Wells Count: 28
Wells Issues?: XXXXX
Issues: Country Estates (Del Oro Water Company) - 1. San Joaquin Estates Mutual Water Co. 1. Ongoing non-compliance with the Nitrate MCL of 45 mg/L 2. Sample results as of 8/01/05 (64 mg/L) 3. Ongoing non compliance of order No. 03-19-04E-098 to provide public n

Potential Solutions:

  Water quality sample results for selected constituents. Values shown for water samples collected 2004-2014.
  Raw Water Delivered Water   Raw Water Delivered Water
  Max. Ave. Count Max. Ave. Count   Max. Ave. Count Max. Ave. Count
Arsenic (10 ug/L): 47.00 10.55 369 47.00 10.55 369 Flouride (2 mg/L): 0.27 0.14 13 0.27 0.14 13
DBCP (0.2 ug/L): 0.01 0.01 16 0.01 0.01 16 Perchlorate (6 ug/L): 4.00 4.00 6 4.00 4.00 6
Nitrate as NO3 (45 mg/L): 31.00 18.41 301 31.00 18.41 301 TCE (5 ug/L): 0.50 0.50 18 0.50 0.50 18
PCB (0.5ug/L): THMs (80 ug/L): 48.00 7.43 48.00 7.43
Uranium (20 pC/L):              

WW Sys. Num.:
Treatment: XXXXX
Design Flow (MGD):

Total Enforcement Actns:
Cat.1 Viol:
Cat. 2 Viol:

Total Viol:

Septic Probs?: XXXXX
Sewer Issues:
Potential Solutions: Country Estates (Del Oro Water Company)1. Abandon existing distribution system 2. Install 4,800 ft. of 8 inch pvc distribution line, valves and appurtenances 3. Install 2,000 ft. of 12 inch transmission line 4. Install 8 fire hydrants 5. Install 89 metered services 6. Purchase Del Oro Water system 7. Misc. legal, engineering,annexation and assessment fees 8. Abandon existing well 9. Install new well to provide backup source 10. Install new or rehab existing pneumatic system and booster pumps Oasis POA Perform "Feasability Study" 1. Install transmission line to consolidate with ENCSD 2. Abandon existing distribution system 3. Install new distribution system 4. Install pressure reducing or regulating valves to new services 5. Install water quality monitoring system for "Homeland security" - Consolidation of East Wilson Road Water Company,San Joaquin Estates Mutual Water Company and Victoty Mutual Water Company into the East Niles Community Services District will require the following infrastructure construction, replacement and abandonment. - The proposed project will consist of replacing all four existing water systems in the respective water company's service areas with new piping, fire hydrants, valves, and service lines as well as constructing a new groundwater well with arsenic removal equipment. Connections will be made to the District's water facilities; however, a new groundwater source will be required to be constructed along with arsenic removal equipment and a standby generator. All existing water wells in the water companies's service areas will be abandoned.Water pipelines of 12-inches in diameter to 8-inches in diameter are to be constructed with resilient seat gate valves, fire hydrants, 1-inch copper water services, meters, and meter boxes. Pipe material will be AWWA C900 PVC pipe. Asphalt concrete pavement repair is anticipated and several road borings are also anticipated to be constructed. It is anticipated that once the existing water systems are abandoned, water connections from District meter boxes to customers' house plumbing will be necessary and is therefore to be included as part of the project. - East Wilson Road Water Company 1. Abandon existing water well 2. Abandon existing water distribution system 3. Install 9,500 ft. of 8-inch PVC distribution lines, valves and appurtenances. 4. Install 4,000 ft. of 12-inch transmission line 5. Fire hydrant installations 6. Install metered services San Joaquin Estates Mutual Water Company 1. Abandon existing water well 2. Construct new water well 3. Abandon existing water distribution system 4. Install 8,200 ft. of 8-inch PVC distribution lines, valves and appurtenances. 5. Fire hydrant installations 6. Install metered services 7. Tie into existing ENCSD arsenic treatment plant if new well is above MCL Victory Mutual Water Company 1. Tie in to ENCSD system 2. Abandon existing distribution system 3. Install 6,200 ft. 8 inch PVC distribution lines, valves and appurtenances. 4. Install 5,200 ft. 12 inch transmission line. 5. Install 14 fire hydrants 6. Install 185 metered services. - This project involves the construction a 600,000-gallon welded steel tank with ringwall foundation, including valves and yard piping within the tank site. The project includes engineering work - design, construction inspection and administration. The intent is to use this location for blending of five groundwater sources ( of which three are currently exceeding the MCL for Arsenic) to meet the arsenic MCL. - This project involves replacing three existing pumps, motors, control panels, suction and discharge piping. Also included is a masonry block structure to protect against the variable weather conditions and improve onsite security measures.This pump station is the entry point to the distribution system for a tank site that receives groundwater from five sources, three of which are exceeding the MCL for Arsenic. Fifty (50%) percent of the Districts total water demand and ninety five (95%) percent of the Districts groundwater must move through this pump station to be delivered to the customers of the District. - Install arsenic treatment
Treatment Comm: XXXXX
SelfHelp Comments: