Water System Details

Error there is more than one entry for Water System Areas.
(Geography, IRWMP, System Category, MHI2010, and DAC calculation are incorrect in database.)

Community: DEL REY COMMUNITY SERV DIST
County: Fresno
Sys. Category:
Agency Name: CSD of DEL REY
Ownership: Public (state, federal, local)
Ownership Type: City, County, State owned
Population: 1500
Connections: 328
2010 MHI: 0,000
SDAC or DAC: SDAC
DAC Classification Source: Calculated

IRWMP:
Geography:
Location:

Contact Title:
Contact:
Phone:
Alt. Contact:
Phone:

H2O Sys. Num.: 1010035
Water Source: GW
Active Wells Count: 6
Wells Issues?: XXXXX
Issues: Del Rey Community Services District (District) provides a variety of services including water to the community of Del Rey, CA with a population of approximately 1,200. The District provides potable water to residential, commercial, and industrial users th

Potential Solutions: expand capacity

  Water quality sample results for selected constituents. Values shown for water samples collected 2004-2014.
  Raw Water Delivered Water   Raw Water Delivered Water
  Max. Ave. Count Max. Ave. Count   Max. Ave. Count Max. Ave. Count
Arsenic (10 ug/L): 3.20 1.99 7 3.20 1.99 7 Flouride (2 mg/L): 0.15 0.08 7 0.15 0.08 7
DBCP (0.2 ug/L): 0.50 0.12 9 0.50 0.12 9 Perchlorate (6 ug/L): 4.00 2.86 7 4.00 2.86 7
Nitrate as NO3 (45 mg/L): 24.70 4.35 33 24.70 4.35 33 TCE (5 ug/L): 0.50 0.33 6 0.50 0.33 6
PCB (0.5ug/L): 6 6 THMs (80 ug/L): 1.00 0.42 6 1.00 0.42 6
Uranium (20 pC/L): 35.00 6.17 6 35.00 6.17 6              

WW Sys. Num.: 273108
Treatment: XXXXX
Design Flow (MGD): 0.2

Total Enforcement Actns: 5
Cat.1 Viol: 2
Cat. 2 Viol: 0

Total Viol: 199

Septic Probs?: XXXXX
Sewer Issues: Capacity committed to development
Potential Solutions: The project consists of new 1-inch water meter installations for 225 existing service connections. The project would include the meters, meter box, handheld meter reader, meter billing software, and software training. It would also required right-of-way encroachment permits from the County of Fresno. - The project would be constructed in two phases:Phase 1: Drilling of a 6-inch-diamater test well to a depth of approximately 700 feet in northwest Del Rey by the casing hammer method of drilling. The test well would provide water quality and quantity information to be used for the design of the production well.Phase 2: This phase would include the drilling and equipping of the production well. The production well would be constructed to produce a minimum of 1,500 gallons per minute. The 16-inch-diamater production well would be drilled to approximately 500 feet deep and sealed with gravel pack and annular cement. The well would be equiped with a vertical turbine pump and motor, discharge piping, chlorination and electrical equipment within a secured enclosure (building), a hydropneumatic tank, an emergency standby generator, and other related site devellopment improvements. A 10-inch-diameter pipeline would be constructed for approximately 1,500 feet to connect the new well to the distribution system.
Treatment Comm: XXXXX
SelfHelp Comments: