Water System Details

Error there is more than one entry for Water System Areas.
(Geography, IRWMP, System Category, MHI2010, and DAC calculation are incorrect in database.)

Community: ARMONA COMMUNITY SERVICES DIST
County: Kings
Sys. Category:
Agency Name: CSD of ARMONA
Ownership: Public (state, federal, local)
Ownership Type: City, County, State owned
Population: 3239
Connections: 1312
2010 MHI: 0,000
SDAC or DAC: SDAC
DAC Classification Source: Calculated

IRWMP:
Geography:
Location: Armona

Contact Title:
Contact: Board of Directors -
Phone:
Alt. Contact:
Phone:

H2O Sys. Num.: 1610001
Water Source: GW
Active Wells Count: 7
Wells Issues?: XXXXX
Issues: Well 2 is in violation of the Federal Drinking Water Standards of 10 ppb for Arsenic. The USEPA has issued an Administrative Order requiring corrective action. The problem must be addressed to remain compliant with the California Department of Public Hea

Potential Solutions:

  Water quality sample results for selected constituents. Values shown for water samples collected 2004-2014.
  Raw Water Delivered Water   Raw Water Delivered Water
  Max. Ave. Count Max. Ave. Count   Max. Ave. Count Max. Ave. Count
Arsenic (10 ug/L): 110.00 16.58 99 110.00 16.58 99 Flouride (2 mg/L): 2.00 1.78 6 2.00 1.78 6
DBCP (0.2 ug/L): 0.00 0.00 6 0.00 0.00 6 Perchlorate (6 ug/L): 0.00 0.00 4 0.00 0.00 4
Nitrate as NO3 (45 mg/L): 0.00 0.00 18 0.00 0.00 18 TCE (5 ug/L): 0.00 0.00 6 0.00 0.00 6
PCB (0.5ug/L): 12 12 THMs (80 ug/L): 0.00 0.00 12 0.00 0.00 12
Uranium (20 pC/L): 0.00 0.00 12 0.00 0.00 12              

WW Sys. Num.: 273208
Treatment: XXXXX
Design Flow (MGD): 0.4

Total Enforcement Actns: 3
Cat.1 Viol: 20
Cat. 2 Viol: 0

Total Viol: 199

Septic Probs?: XXXXX
Sewer Issues:
Potential Solutions: Well No. 2. The goal is to drill a new well that would not require treatment, producing water with Arsenic concentrations below the maximum contaminant level. The replacement well would require property acquisition, drilling a test well, installation of a permanent production well, appurtenant site facilities, and construction of a new water main to connect to the existing distribution system. Additionally, the project may include treatment facilities and a transmission main to Well No. 2 for blending if the new well does not produce a sufficient amount of water with desirable water quality characteristics.-The project would consist of modifying the existing treatment facilities at Well No. 1 to provide removal of arsenic from water produced by the well. The project will include retrofitting of the existing filters, replacing filter media, installing chemical storage tanks and controls and related appurtenant facilities.-The project would consist of installing a transmission main between the existing Well #2 and the proposed Well #3. The water from Well #2 would be conveyed to the Well #3 treatment plant for treatment. Water from Well #2 would serve as a backup water supply in the event that Well #3 goes out of service. The project would also include a second pipeline from Well #3 to Well #2 to fill the existing storage tank to maintain use of the tank and generator as a backup water supply.-Install new water storage tank at Well Site No. 2.-INSTALL A SCADA SYSTEM. OTHER - DESIGN AND CONSTRUCTION
Treatment Comm: XXXXX
SelfHelp Comments: may be excluded from Kings IRWMP boundary, but should be listed as nearby white area, not covered by an IRWMP